Project Overview

The L&S team was responsible for the mechanical and plumbing system designs for this new high school that serves 800 students and includes an open courtyard with two story academic wings on each side.

The academic wings are linked by a central commons area linking the academic wings with the main entry, a full auditorium, main gymnasium, auxiliary gymnasium, locker rooms, kitchen, STEM shop areas.

Per the owner’s request, we worked closely with the architect to locate all of the facility’s mechanical equipment in mechanical rooms or mezzanine mechanical spaces for ease of maintenance and access.

The school was designed to meet the Washington State Sustainable Schools Protocol.

Consultant and Contractor Teammates:

  • NAC Electrical (electrical engineering)
  • DCI Engineers (structural engineering)
  • Parametrix (civil engineering)
  • FP Engineering (fire protection)
  • Petersen Design Associates (food service)
  • PLA Designs (theater)
  • MT-LA (landscape)
  • Fowler General Contractors
  • Apollo Mechanical (plumbing, HVAC wet and dry mechanical contractors)
  • SPHC (controls)
  • CBRE/Heery (owner representative)
Project Specifications
  • Delivery Method: Traditional Design Bid Build
  • Size: 186,000 sq. ft.
  • Project Cost: $65 Million
  • Completion Date: August 2019
  • Architect: NAC Architecture
  • Owner: Quincy School District
Engineering Features
  • Washington Sustainable Schools Protocol (WSSP)
  • 4-pipe fan coils system with Dedicated Outside Air System (DOAS) ventilation with premium maintenance access
  • Demand control ventilation
  • High-efficiency, gas-fired heating water boilers with variable flow hydronic systems
  • High-efficiency chilled water plant
  • Air-to-air energy recovery utilized on the building’s ventilation air
  • High-velocity sawdust collection

More Projects

  • The MLK Jr. Aquatics Center in Yakima is a modern outdoor facility offering inclusive recreation, swim programs, and community space, supported by integrated HVAC and plumbing systems designed by L&S Engineering.

  • New injection molding facility on the Nelson Irrigation manufacturing and testing campus in Walla Walla. The L&S team was responsible for the mechanical, plumbing, and electrical systems design.

  • The modernization and addition to the south wing of the main building, played a critical role in campus identity and branding, providing a new “face of the campus” in preparation for the completion of the north/south freeway just west of the addition. The L&S team was responsible for the mechanical and plumbing systems design.

  • New modern apartment complex with attached and adjacent retail spaces in Richland. The L&S team was responsible for the mechanical, plumbing, and electrical systems design.

  • New women’s permanent supportive housing (PSH) project providing women and their children a steady home. This project was unique as it was designed to be energy efficient with some of the cottages designed to have net zero energy use over a year. The L&S team was responsible for the mechanical, plumbing, and electrical systems design.

  • New youth center including a gymnasium and aquatic center for Marimn Health and the Coeur d’Alene Tribe in Worley Idaho. The L&S team was responsible for the mechanical and plumbing systems design.

  • Gymnasium, commons, and classroom addition and overall renovation to Spokane Public School's Franklin Elementary School in south Spokane. The L&S team was responsible for the mechanical and plumbing systems design incorporating existing and new systems.

  • New Quincy Public Schools high school in Quincy serving 800 students. It includes an open courtyard with two-story academic wings on each side. The L&S team was responsible for the mechanical and plumbing systems design.

  • Commons addition to Spokane Public School's Lewis and Clark High School. This project provided a unique opportunity to tie today’s innovative building systems with Lewis and Clark’s historic building. The L&S team was responsible for the mechanical and plumbing systems design.

  • New Spokane Public Schools middle school in northeast Spokane is one of the projects Spokane voters approved by passing the 2018 Bond. The L&S team was responsible for the mechanical and plumbing systems design.