Park Place Apartments & Retail

“Richland’s Premier Residence”
Richland, WA

Project Overview

The L&S team was responsible for the mechanical, plumbing, and electrical systems design for this modern apartment complex with adjacent and attached retail spaces. The mechanical systems include a central dedicated outside air system and variable refrigerant flow systems serving shared spaces and residences. Plumbing was designed with the ability to isolate individual residences to allow for maintenance. Hot water is supplied to individual residences from a central gas water heating system. L&S also played a part in providing the infrastructure for a pool and associated water treatment system.

In addition to the apartment complex, L&S designed HVAC, plumbing, and electrical systems for retail shells to be built out by future occupants.

For a closer look at one of Richland’s Premiere Residential Properties – click here Park Place – Richland

Consultant and Contractor Teammates:

Project Specifications
  • Size: 119,800 sq. ft.
  • Completion Date: Fall 2020
  • Architect: TVA Architects
  • Client: Park Place
Engineering Features
  • Central Dedicated Outside Air System (DOAS)
  • Variable Refrigerant Flow system
  • Central domestic hot water system serving shared spaces and residences.
  • Infrastructure for pool water

More Projects

  • The MLK Jr. Aquatics Center in Yakima is a modern outdoor facility offering inclusive recreation, swim programs, and community space, supported by integrated HVAC and plumbing systems designed by L&S Engineering.

  • New injection molding facility on the Nelson Irrigation manufacturing and testing campus in Walla Walla. The L&S team was responsible for the mechanical, plumbing, and electrical systems design.

  • The modernization and addition to the south wing of the main building, played a critical role in campus identity and branding, providing a new “face of the campus” in preparation for the completion of the north/south freeway just west of the addition. The L&S team was responsible for the mechanical and plumbing systems design.

  • New modern apartment complex with attached and adjacent retail spaces in Richland. The L&S team was responsible for the mechanical, plumbing, and electrical systems design.

  • New women’s permanent supportive housing (PSH) project providing women and their children a steady home. This project was unique as it was designed to be energy efficient with some of the cottages designed to have net zero energy use over a year. The L&S team was responsible for the mechanical, plumbing, and electrical systems design.

  • New youth center including a gymnasium and aquatic center for Marimn Health and the Coeur d’Alene Tribe in Worley Idaho. The L&S team was responsible for the mechanical and plumbing systems design.

  • Gymnasium, commons, and classroom addition and overall renovation to Spokane Public School's Franklin Elementary School in south Spokane. The L&S team was responsible for the mechanical and plumbing systems design incorporating existing and new systems.

  • New Quincy Public Schools high school in Quincy serving 800 students. It includes an open courtyard with two-story academic wings on each side. The L&S team was responsible for the mechanical and plumbing systems design.

  • Commons addition to Spokane Public School's Lewis and Clark High School. This project provided a unique opportunity to tie today’s innovative building systems with Lewis and Clark’s historic building. The L&S team was responsible for the mechanical and plumbing systems design.

  • New Spokane Public Schools middle school in northeast Spokane is one of the projects Spokane voters approved by passing the 2018 Bond. The L&S team was responsible for the mechanical and plumbing systems design.