Martin Luther King Jr. Park – Aquatics Center

Yakima, WA

Project Overview

The MLK Jr. Aquatics Center in Yakima, Washington, is a community-focused outdoor facility developed through years of advocacy and public–private collaboration. Located at Martin Luther King Jr. Park, it restores outdoor aquatic access to the region while supporting recreation, water safety, and inclusive programming for all ages. Replacing aging neighborhood pools, the center serves as a regional hub for swim instruction, recreation, and community gatherings, reflecting Yakima’s commitment to equitable access to modern public amenities.

The facility features two lifestyle pools, a dedicated support building, and a range of attractions including zero-depth entry, lap lanes, waterslides, and interactive play elements. Designed for accessibility, safety, and durability, it also includes shaded seating and spaces for lessons and programming. L&S Engineering provided HVAC and plumbing design for the changing rooms and offices. Their work supported ventilation, humidity control, and system integration in close collaboration with architectural and aquatic design teams.

Consultant and Contractor Teammates:

  • NAC Electrical (Electrical engineering)
  • Coffman Engineers, Inc. (Structural engineering)
  • Parametrix (Civil Engineering)
  • Water Technologies Inc. (Pool design)
  • Chervenell Construction (General Contractor)
  • Cutting Edge Plumbing & Mechanical (Plumbing Contractor)
  • Bruce Inc. (HVAC Contractor)
Project Specifications
  • Delivery Method: Traditional Design Bid Build

  • Size: 5,000 sq. ft. of enclosed space

  • Project Cost: $10 Million

  • Completion Date: June 2025

  • Architect: NAC Architecture
  • Client: City of Yakima

Engineering Features
  • 1-to-1 Heat Pump Ductless Split System

  • Air-to-Air Energy Recovery Ventilator

  • Robust Plumbing Fixtures

More Projects

  • The MLK Jr. Aquatics Center in Yakima is a modern outdoor facility offering inclusive recreation, swim programs, and community space, supported by integrated HVAC and plumbing systems designed by L&S Engineering.

  • New injection molding facility on the Nelson Irrigation manufacturing and testing campus in Walla Walla. The L&S team was responsible for the mechanical, plumbing, and electrical systems design.

  • The modernization and addition to the south wing of the main building, played a critical role in campus identity and branding, providing a new “face of the campus” in preparation for the completion of the north/south freeway just west of the addition. The L&S team was responsible for the mechanical and plumbing systems design.

  • New modern apartment complex with attached and adjacent retail spaces in Richland. The L&S team was responsible for the mechanical, plumbing, and electrical systems design.

  • New women’s permanent supportive housing (PSH) project providing women and their children a steady home. This project was unique as it was designed to be energy efficient with some of the cottages designed to have net zero energy use over a year. The L&S team was responsible for the mechanical, plumbing, and electrical systems design.

  • New youth center including a gymnasium and aquatic center for Marimn Health and the Coeur d’Alene Tribe in Worley Idaho. The L&S team was responsible for the mechanical and plumbing systems design.

  • Gymnasium, commons, and classroom addition and overall renovation to Spokane Public School's Franklin Elementary School in south Spokane. The L&S team was responsible for the mechanical and plumbing systems design incorporating existing and new systems.

  • New Quincy Public Schools high school in Quincy serving 800 students. It includes an open courtyard with two-story academic wings on each side. The L&S team was responsible for the mechanical and plumbing systems design.

  • Commons addition to Spokane Public School's Lewis and Clark High School. This project provided a unique opportunity to tie today’s innovative building systems with Lewis and Clark’s historic building. The L&S team was responsible for the mechanical and plumbing systems design.

  • New Spokane Public Schools middle school in northeast Spokane is one of the projects Spokane voters approved by passing the 2018 Bond. The L&S team was responsible for the mechanical and plumbing systems design.