Lewis & Clark High School Commons Addition

Home of the Tigers!
Spokane, WA

Project Overview

The Lewis and Clark High School Commons Additions project provided a unique opportunity to tie today’s innovative building systems with Lewis and Clark’s historic building.

The new 35,000 SF addition equipped the school with significant improvements that were unavailable over its 100-year history. ADA access and campus security were enhanced, as well as a new state-of-the-art kitchen, nine classrooms, and spacious commons area.

The main commons area creates an open space for students to comfortably gather, featuring radiant floor heating (and cooling) beneath the polished concrete floor.

Each classroom is fully equipped with modern audio and visual technologies to provide innovative learning opportunities.

The addition has a standalone mechanical system, and below grade space utilized for a mechanical room which houses the majority of mechanical equipment for premium maintainability.

Garco Construction Portfolio – Lewis & Clark High School Commons Addition

Consultant and Contractor Teammates:

  • Garco Construction
  • Metalcraft Mechanical (Dry side mechanical)
  • ETCO Services (Wet side mechanical)
Project Specifications
  • Delivery Method: Traditional Design Build
  • Size: 35,000 sq. ft.
  • Project Cost: $16 Million
  • Completion Date: October 2020
  • Architect: NAC Architecture
  • Client: Spokane Public Schools
Engineering Features
  • Washington Sustainable Schools Protocol (WSSP)
  • Radiant floor heating (and cooling)
  • 4-Pipe Fan Coils System
  • Dedicated Outside Air System (DOAS) with air-to-air energy recovery.
  • Demand control ventilation
  • High-Efficiency Condensing Gas Fired heating water boilers with variable flow hydronic systems.
  • High-Efficiency Chilled Water Plant

More Projects

  • The MLK Jr. Aquatics Center in Yakima is a modern outdoor facility offering inclusive recreation, swim programs, and community space, supported by integrated HVAC and plumbing systems designed by L&S Engineering.

  • New injection molding facility on the Nelson Irrigation manufacturing and testing campus in Walla Walla. The L&S team was responsible for the mechanical, plumbing, and electrical systems design.

  • The modernization and addition to the south wing of the main building, played a critical role in campus identity and branding, providing a new “face of the campus” in preparation for the completion of the north/south freeway just west of the addition. The L&S team was responsible for the mechanical and plumbing systems design.

  • New modern apartment complex with attached and adjacent retail spaces in Richland. The L&S team was responsible for the mechanical, plumbing, and electrical systems design.

  • New women’s permanent supportive housing (PSH) project providing women and their children a steady home. This project was unique as it was designed to be energy efficient with some of the cottages designed to have net zero energy use over a year. The L&S team was responsible for the mechanical, plumbing, and electrical systems design.

  • New youth center including a gymnasium and aquatic center for Marimn Health and the Coeur d’Alene Tribe in Worley Idaho. The L&S team was responsible for the mechanical and plumbing systems design.

  • Gymnasium, commons, and classroom addition and overall renovation to Spokane Public School's Franklin Elementary School in south Spokane. The L&S team was responsible for the mechanical and plumbing systems design incorporating existing and new systems.

  • New Quincy Public Schools high school in Quincy serving 800 students. It includes an open courtyard with two-story academic wings on each side. The L&S team was responsible for the mechanical and plumbing systems design.

  • Commons addition to Spokane Public School's Lewis and Clark High School. This project provided a unique opportunity to tie today’s innovative building systems with Lewis and Clark’s historic building. The L&S team was responsible for the mechanical and plumbing systems design.

  • New Spokane Public Schools middle school in northeast Spokane is one of the projects Spokane voters approved by passing the 2018 Bond. The L&S team was responsible for the mechanical and plumbing systems design.